The original Gotthard railway tunnel through the Swiss Alps, took ten years to build and cost 147 lives. It was a mammoth undertaking and required the construction of long ramps on either side totalling 85 miles. Dozens of tunnels, viaducts and bridges were necessary. The ruling gradient of 1 in 37 was deemed to be just about the maximum that the original steam locomotives could handle, even then, trains were usually double-headed and even had banking engines attached at the rear! In order even to keep to this severe gradient, the engineers had to construct a number of additional spiral tunnels to gain height, hewn out of solid rock…
Title | The Old Gotthard Tunnel Route - Driver's Eye View |
---|---|
Year | 2018 |
Genre | Documentary |
Country | United Kingdom |
Studio | Video 125 |
Cast | Jonathan Kydd |
Crew | Peter Middleton (Producer), Peter Middleton (Writer) |
Keyword | |
Release | Oct 01, 2018 |
Runtime | 112 minutes |
Quality | HD |
IMDb | 0.00 / 10 by 0 users |
Popularity | 1 |
Budget | 0 |
Revenue | 0 |
Language | English |